LAMATA resumes Blue Line passenger services following cable insulation failure 

The Lagos Metropolitan Area Transport Authority (LAMATA) has announced the resumption of passenger services on the Lagos Blue Line after operations were halted on Saturday, October 26, 2024, due to a fire triggered by a cable insulation failure.

The disclosure was contained in a statement by LAMATA’s Head of Corporate Communication, Kolawole Ojelabi, as seen on the Authority’s official X (formerly Twitter) account on Sunday evening.

The resumption of passenger operations follows the replacement of the burnt power cable supplying electricity to the tracks. Engineers began repairs on Saturday evening, immediately after the fire was extinguished, clearing the DRUPS (Diesel Rotary Uninterruptible Power Supply) alarm and restoring power at the generation plant.

“The Lagos Rail Mass Transit (LRMT) Blue Line from Marina to Mile 2 resumed passenger operations today after engineers restored power to the tracks,” the statement read in part. 

It added, “The DRUPS (Diesel Rotary…

Report

Leave a Reply

Your email address will not be published. Required fields are marked *